Posted 1-24-2012
Heidtman to Build Processing Facility at TK Site 
Heidtman Steel, one of North America's largest flat-rolled carbon steel processing companies, will begin construction soon on a new 114,000-square-foot processing facility in Calvert, Ala. The $18.5 million facility will be located on the campus of ThyssenKrupp Steel.

"ThyssenKrupp's Calvert mill is touted as the most technologically advanced steel mill in the world," says Tim Berra, president of Heidtman Steel, Toledo, Ohio. "By locating on their campus, we continue our mill-adjacent business strategy that maximizes productivity while minimizing yield loss."

Phase one of the facility will include installation of a 0.250-inch by 78-inch slitter capable of handling 80,000-pound coils. Future expansion plans will be determined by market needs and are expected to include heavy-gauge slitting. The company estimates the first phase will be operational in first-quarter 2013.

"This decision was made to fulfill the requirements to better service our customers that have locations in the southern U.S. and Mexico," says Berra. "This facility completes a strategy that we have been exploring for several years in the South."
June 2016: Toeing the Line on Workers' Wages
More...
 
Pause
June 2016: Take a Pass on Pass-Through DBEs
More...
Fall 2015: Cutting & Sawing Equipment
More...
Summer 2015
More...
 
Pause
Butech Bliss Multi-Blanking Line Handles High-Strength Steel
More...
Bradbury Group: Athader's Double Eccentric Slitter Head Eliminates Movement
More...
FIMI Lines Slit Steel, Aluminum
More...
Red Bud Industries, Offers Heavy-Gauge Slitters
More...
Cosen's MechaLogix System Monitors Blade Life
More...
Behringer Band Saw Designed for Fast Material Removal
More...
Pat Mooney: Danobat Band Saw Has Zone Cut Technology
More...
 
Pause
Privacy Statement  |  Terms Of Use
Copyright by Metal Center News



Friday, July 1, 2016